Advanced Search
    NI Jin-fei. The Supervision and Inspection of the Quality of X-ray Testing During Boiler Installation[J]. Nondestructive Testing, 2007, 29(10): 609-610.
    Citation: NI Jin-fei. The Supervision and Inspection of the Quality of X-ray Testing During Boiler Installation[J]. Nondestructive Testing, 2007, 29(10): 609-610.

    The Supervision and Inspection of the Quality of X-ray Testing During Boiler Installation

    • Some key factors during the supervision and inspection of radiographic testing for boiler installation were surveyed, such as the management of personnel, equipment and environment, the testing process, film quality and evaluation accuracy. The suggestion was given in order to meet the new testing standard that the boiler installation company should have good cooperation with supervision and inspection company.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return