Advanced Search
    MU Yan-Chun, CHEN Yue-Fei, JIN Nan-Hui. Quality Control of Radiographic Testing During Supervision and Inspection of Power Plant Boiler Installation[J]. Nondestructive Testing, 2010, 32(11): 905-908.
    Citation: MU Yan-Chun, CHEN Yue-Fei, JIN Nan-Hui. Quality Control of Radiographic Testing During Supervision and Inspection of Power Plant Boiler Installation[J]. Nondestructive Testing, 2010, 32(11): 905-908.

    Quality Control of Radiographic Testing During Supervision and Inspection of Power Plant Boiler Installation

    • For ensuring the quality of RT inspection while installing power plant boiler, and following the relative standard, the paper overviews the problems during RT inspection and the factors which impact staff management, equipment and environment management, inspection procedure, film quality and assessment accuracy, and then proposes the corresponding recommendations.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return