Advanced Search
    XU Yaya, LIU Xingyong, XU Jian, ZHANG Ming. Opitimization on F.P.I. process and procedure for signaling lead pipe of anti-asthmatic presure[J]. Nondestructive Testing, 2020, 42(4): 69-71. DOI: 10.11973/wsjc202004015
    Citation: XU Yaya, LIU Xingyong, XU Jian, ZHANG Ming. Opitimization on F.P.I. process and procedure for signaling lead pipe of anti-asthmatic presure[J]. Nondestructive Testing, 2020, 42(4): 69-71. DOI: 10.11973/wsjc202004015

    Opitimization on F.P.I. process and procedure for signaling lead pipe of anti-asthmatic presure

    • During the fluorescent penetrant inspection of signaling lead pipe of anti-asthmatic pressure, different F.P.I results for the parts can often be presented among the different production departments even the parts to be inspected have not been undertaken any procession. This paper aims to solve the above-mentioned problems and to analyze the reason of such different results by combining theoretical study with process examination. Some reasonable and effective methods based on the reason analysis were deduced.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return