Advanced Search
    LIU Guiji, ZHANG Guodong, WEI Li, YANG Guofeng, MA Jing. Discussion on Design of Piping Calibration Block Based on ASME BPVC[J]. Nondestructive Testing, 2018, 40(9): 76-78. DOI: 10.11973/wsjc201809019
    Citation: LIU Guiji, ZHANG Guodong, WEI Li, YANG Guofeng, MA Jing. Discussion on Design of Piping Calibration Block Based on ASME BPVC[J]. Nondestructive Testing, 2018, 40(9): 76-78. DOI: 10.11973/wsjc201809019

    Discussion on Design of Piping Calibration Block Based on ASME BPVC

    • Mandatory appendix Article 4 ASME BPVC Section V introduces the requirements of PAUT inspection, and the general requirement for its calibration block is referred back to Article 4 with some modification. In order to make it more efficient in PAUT system calibration, this article gives some recommendations on calibration block's configuration, reflector position and size under condition of fulfilling the requirement of ASME BPVC Section V.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return