Citation: | LIU En-kai, MA Zhan-yun, WANG Zhong-xu, MA Zhong-li, YANG Zhong-wei. Feasibility on the Use of Phased Array Inspection as a Replacement of Radiographic Inspection for Butt Welding of Steel Containment Vessel of Nuclear Power Equipment[J]. Nondestructive Testing, 2017, 39(4): 72-75. DOI: 10.11973/wsjc201704015 |
[1] |
郑晖,林树青.超声检测[M].北京:中国劳动社会保障出版社,2008:20-50.
|
[2] |
施克仁,郭寓岷.相控阵超声成像检测[M].北京:高等教育出版社,2010:15-25.
|
[3] |
MICHAEL D, MOLES C. Introduction to phased array ultrasonic technology application[M]. USA: Olympus NDT, 2004.
|
[4] |
ASME V 2010 Boiler & pressure vessel code[S].
|
[5] |
MORAN T L, RAMUHALLI P, PARDINI A F, et al. Replacement of radiography with ultrasonic for the nondestructive inspection of welds-evaluation of technical gaps - an interim report[C]//Washington: Pacific Northwest National Laboratory,2010.
|
[6] |
赵晓鑫,王伏喜,鄂楠,等. 相控阵检测与射线检测的缺陷识别对比[J]. 无损检测, 2016, 38(1): 41-44.
|
[7] |
李衍.管道环缝相控阵超声探伤技术的应用[J].无损检测,2002,24(9):386-390.
|
[8] |
钟德煌,郑攀忠. 便携式相控阵仪在焊缝超声检测中的应用[J].无损检测,2009,31(3):233-235.
|