GE Liang, CAI Jia-fan, NIE Yong, LIANG Ping. Differences of NDT Technology Requirement between Manufacture and Operation Period of Nuclear Equipment in ASME Code[J]. Nondestructive Testing, 2016, 38(3): 85-90. DOI: 10.11973/wsjc201603021
Citation:
GE Liang, CAI Jia-fan, NIE Yong, LIANG Ping. Differences of NDT Technology Requirement between Manufacture and Operation Period of Nuclear Equipment in ASME Code[J]. Nondestructive Testing, 2016, 38(3): 85-90. DOI: 10.11973/wsjc201603021
GE Liang, CAI Jia-fan, NIE Yong, LIANG Ping. Differences of NDT Technology Requirement between Manufacture and Operation Period of Nuclear Equipment in ASME Code[J]. Nondestructive Testing, 2016, 38(3): 85-90. DOI: 10.11973/wsjc201603021
Citation:
GE Liang, CAI Jia-fan, NIE Yong, LIANG Ping. Differences of NDT Technology Requirement between Manufacture and Operation Period of Nuclear Equipment in ASME Code[J]. Nondestructive Testing, 2016, 38(3): 85-90. DOI: 10.11973/wsjc201603021
Differences of NDT Technology Requirement between Manufacture and Operation Period of Nuclear Equipment in ASME Code
This paper takes the ASME code as an example to describe the requirement of NDT for nuclear equipment in Manufacture and Operation Periods, and to analyze and compare the corresponding requirements of inspection scope, technique and acceptance standard in this two period, as well as, the sum-up the difference.